Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

The 9 largest commercial construction starts of July 2024

Posted on August 26, 2024




This audio is auto-generated. Please tell us in case you have suggestions.

Building begins will possible stay unstable within the coming months, regardless of a current bounceback in exercise, mentioned Richard Department, chief economist of Dodge Building Community.

Complete development begins rebounded 10% in July to a seasonally adjusted annual charge of $1.1 trillion, in line with Dodge. The resurgence follows a big decline in June, the place complete groundbreakings plummeted 19% because of a stark drop in utility and fuel initiatives.

However exercise in infrastructure development and nonresidential sectors, equivalent to retail, workplace and warehouse initiatives, drove an total restoration in July, offsetting a droop in residential development, in line with the report.

“Building begins confirmed nice promise in July. Nonetheless, the short-term stays questionable because of excessive rates of interest,” mentioned Richard Department, chief economist of Dodge Building Community, within the launch. “The Federal Reserve is more likely to minimize rates of interest in September, which is able to, over time, make market situations extra conducive to transferring initiatives ahead.”

Listed here are the highest 9 U.S. initiatives to interrupt floor in July:

  • The $2.1 billion Novo Nordisk plant in Clayton, North Carolina.
  • The $1.6 billion first part of the AWS Amazon knowledge heart in Canton, Mississippi.
  • The $1.5 billion Revolution Wind offshore wind farm off the coast of Rhode Island.
  • The $819 million Potomac River Tunnel in Washington, D.C.
  • The $800 million Meta knowledge heart in Montgomery, Alabama.
  • The $800 million Ryan Subject Stadium at Northwestern College in Evanston, Illinois.
  • The $300 million Music Row Albion condominium towers in Nashville, Tennessee.
  • The $254 million Commodore Perry flats in Buffalo, New York.
  • The $250 million One Tampa condominiums in Tampa, Florida.

12 months-to-date progress

Complete development begins rose 6% within the first seven months of the yr in comparison with the identical interval in 2023, in line with Dodge.

Nonresidential begins posted a 5% improve, whereas residential groundbreakings jumped 11%. Nonbuilding begins by way of the primary seven months of the yr posted no change in comparison with final yr.

On a month-to-month foundation, nonresidential development begins improved 25% in July, largely because of vital exercise within the manufacturing, knowledge heart and lodge sectors, in line with Dodge. Institutional initiatives, equivalent to healthcare, jumped 18% in July because of a pointy improve in healthcare begins.

Nonbuilding development elevated 19% in July because of optimistic exercise in all subsectors, together with highways, bridges, utility vegetation and fuel vegetation. Residential begins, however, ticked down 8% in July, largely because of a 13% slowdown in single-family initiatives, in line with Dodge.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Top 10 Project Management Tools Every Leader Should Know
  • Three Lotto Players Share $1 Million
  • How To Use Virtual And Augmented Reality In eLearning
  • Florida worker dies in gruesome incident, another charged with manslaughter
  • 3 Sure-Fire Ways To Screw Up Your Project

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme