Skip to content
PMMilestoneCalculators

208 free calculators · 45 in-depth guides

Calculators that show their working.

Money, health, maths and — unusually — construction and project controls. Every tool states its formula, walks through a real example and names its sources.

All calculators A–Z →
Scientific
0

Popular calculators

Construction & Project Calculators

Our flagship category — built from 20+ years on site

View all 55 construction & project calculators →

Latest articles

All articles →
Cumulative cash flow S-curve dipping to a peak funding point on a construction projectConstruction & ProjectConstruction cash flow forecast: how to find your peak funding needA worked example showing how payment lag, retention and an S-curve spend profile set a project's peak funding need, and how to reduce it.29 November 2026 · 11 min readScheduler reviewing a CPM Gantt chart with logic links and a schedule health checklistConstruction & ProjectDCMA 14-point schedule assessment: a practical guideEach of the 14 DCMA schedule checks explained by a scheduler: thresholds, a worked example where CPLI looks perfect but BEI says otherwise, and how to fix what fails.28 November 2026 · 13 min readStructural steel beams on a construction site with a rising price index chart showing a contract price escalation adjustmentConstruction & ProjectHow to Calculate a Price Escalation Clause in 2026: Formula, Steel Example and Common MistakesA practical method for index-based price adjustment: choosing the index, base and adjustment months, thresholds, caps, composites and the mistakes behind most disputes.27 November 2026 · 12 min readIllustrated excavator on a construction site beside a cost-per-hour card splitting ownership, fuel, maintenance and operator costsConstruction & ProjectEquipment hourly cost: how to calculate it and when renting wins in 2026Build an honest machine rate from depreciation, capital, fuel, repairs and operator cost, then test it against rental with a breakeven-hours check.25 November 2026 · 12 min readConstruction cost S-curve with an escalation allowance rising from the estimate base date to the midpoint of constructionConstruction & ProjectHow to Calculate Construction Cost Escalation in 2026: Midpoint, Cash Flow and Rate SelectionA practical method for escalating a base-date estimate: midpoint of construction, cash-flow phasing, rate sources, sensitivity, and common mistakes.18 November 2026 · 12 min readRetirement drawdown table comparing inflation-adjusted withdrawals and annual portfolio balancesFinancialRetirement Withdrawal Rates: Beyond the 4% ShortcutUnderstand initial withdrawal rates, inflation adjustments, sequence risk, and the historical assumptions behind the 4% rule.17 November 2026 · 7 min read

Editor's picks

Who builds this

Dr. Hassan Khames Eliwa

PhD, project controls consultant, Auckland

How calculators are testedEach formula has automated tests, and the worked example on every page is checked against the calculator's own output before it's published.

Private by designCalculations run in your browser. Nothing you type into a calculator is sent to us or stored. Read our standards.