Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu

OMA to expand Manhattan’s New Museum

Posted on March 1, 2025




Renders courtesy of OMA/bloomimages.de

The Workplace for Metropolitan Structure (OMA) has been chosen to design a 60,000 sq ft extension to a up to date artwork gallery in Manhattan.

The New Museum was designed by Japanese architect SANAA for a website within the Bowery. The extension will double its area and add three lifts, an entrance plaza and artist residency areas.

The seven-storey undertaking may have a definite façade produced from glass and metallic mesh and can align with the prevailing constructing on the second, third and fourth flooring. There may also be a bigger entrance foyer full with restaurant, and an open-air public artwork venue.

Three upper-floor terraces overlooking the Bowery will likely be created and the seventh-floor sky room will likely be expanded.

Shohei Shigematsu, a accomplice in OMA, mentioned: “The New Museum is an incubator for cultural views and manufacturing, and the growth goals to embody that perspective of openness.

“Imagined as a extremely related but distinct counterpart to the prevailing museum’s verticality and solidity, the brand new constructing will provide horizontally expansive galleries for curatorial selection, open vertical circulation, and a range of areas for gathering, change and creation.”

The New Museum has raised $118m for the $125m undertaking, of which $82m will go in the direction of building prices.

  • Subscribe right here to get tales about building all over the world in your inbox 3 times per week



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • El Proceso de Gestión de Cambios de un Proyecto
  • Turner, AECOM Hunt JV lands Dallas convention center job
  • Kiwi Investment Volumes On Wall Street At Near Record Levels – US Treasury Data
  • Onboarding Checklist For L&D – eLearning Industry
  • Implenia to build rail tunnels under Frankfurt

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme