Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

Hill team to help Bulgaria become transit hub for non-Russian gas

Posted on August 6, 2024




Bulgaria’s “Vertical Gasoline Hall” will create a north-south transmission axis forward of the anticipated suspension of Russian gasoline shipments via Ukraine from 2025 (Ssuaphoto/Dreamstime)

US-headquartered Hill Worldwide has gained two contracts collectively price round $270m to assist modify Bulgaria’s gasoline pipeline community so it may possibly ship liquified pure gasoline (LNG) dropped at Greece from the US and elsewhere northward to Romania and on to Ukraine and Jap Europe.

Deliberate since 2016 by Bulgaria, Greece, Romania and Hungary, the so-called “Vertical Gasoline Hall” goals to create a north-south transmission axis forward of the anticipated suspension of Russian gasoline shipments via Ukraine from 2025.

Since then, gasoline transmission firms from Slovakia, Moldova, and Ukraine have gotten concerned.

The Hill staff contains US and Bulgarian engineers and contractors.

Saying the contracts on 6 June, Bulgarian Prime Minister Dimitar Glavchev mentioned the brand new hall would “set up itself as infrastructure of main significance for all the area”.

‘Decouple from Russian gasoline’

Talking in regards to the scheme in March, US Assistant Secretary for Vitality Sources, Geoffrey R. Pyatt, mentioned: “Utilizing present infrastructure from Greece as much as Ukraine, the Vertical Hall will enable LNG imported via Greece to fill the huge storage tanks in Ukraine, offering a brand new supply of gasoline for Central Europe and the Western Balkans, and serving to to cut back worth volatility alongside the way in which.”

“It’s going to even be essential in supporting the EU’s intention to completely decouple from Russian gasoline by 2027,” he added.

Pyatt was US Ambassador to Greece from 2016 to 2022, and to Ukraine from 2013 to 2016.

Rising north-south capability

Working for gasoline firm Bulgartransgaz, the Hill staff will enhance north-south transit capability by constructing further pipelines – often known as “looping” – alongside two routes.

One is a 50km stretch between the cities of Kulata and Kresna, a contract valued at round $73m.

The opposite, price some $197m, entails looping a 70km stretch between Rupcha and Vetrino.

These two are the largest of three looping contracts designed to create the hall.

  • Subscribe right here to get tales about development all over the world in your inbox thrice per week



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Remote Work Revolution: HR’s Role in Transitioning to a Hybrid Model
  • Snowflake shares soar as revenue tops $1 billion for first time
  • Sustainable Solutions: Green Construction Technology for a Better Future
  • Intelligent Learning Systems With AI: Beyond Chatbots
  • 6 Tools For Making Frustrating Tasks Fun Again

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme