Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

Garney-led team to build $952M Virginia wastewater plant

Posted on August 12, 2024




This audio is auto-generated. Please tell us if in case you have suggestions.

Award: Wastewater remedy plant
Whole worth: $952 million
Location: Suffolk, Virginia
Consumer: Hampton Roads Sanitation District

The Hampton Roads Sanitation District picked Garney to design and construct a $952 million wastewater remedy plant in Suffolk, Virginia, in keeping with a information launch from the corporate shared with Building Dive. The brand new Nansemond Remedy Plant facility goals to handle air pollution within the Chesapeake Bay and shield japanese Virginia’s groundwater provide.

North Kansas Metropolis, Missouri-based Garney will lead the undertaking group, which incorporates:

  • Pasadena, California-headquartered Tetra Tech because the lead design engineer. 
  • Walnut Creek, California-based Carollo Engineers, specializing in superior remedy design.
  • MEB of Chesapeake, Virginia, as a contractor associate.

Wastewater is a booming enterprise proper now: Main AEC companies resembling Jacobs, WSP and AECOM are focusing closely on water initiatives, leaders stated in current earnings calls.

The undertaking is a part of the sanitation district’s Sustainable Water Initiative for Tomorrow, which goals to make sure a sustainable groundwater supply for the area and to handle important environmental challenges. Particularly, SWIFT goals to cut back nutrient discharge into the Chesapeake Bay, replenish Potomac Aquifer groundwater ranges, fight sea-level rise, shield in opposition to saltwater intrusion and supply important water sources for companies.

The power will use superior remedy strategies, together with biofiltration, granular activated carbon and ultraviolet disinfection to transform wastewater into high-quality consuming water, in keeping with the discharge. This handled water will replenish the Potomac Aquifer, japanese Virginia’s major groundwater supply, by means of 19 managed recharge wells. 

Per the undertaking web site, the ANRI Facility prices roughly $300 million, the SWIFT facility is roughly $570 million and the recharge wells are roughly $82 million. It’s financed with low-interest loans from the EPA and Virginia Clear Water Revolving Mortgage Funds in addition to wastewater remedy charges paid by HRSD clients.

Building is ready to start out in fall 2025 and the ability is predicted to start out working in spring 2029, in keeping with the undertaking web site.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • What Is a Site Office in Construction Project Management?
  • Carroll Daniel Opens New Office in Mobile, Ala.
  • Nike stock soars after better than feared Q4 2025 results
  • Bias In, Bias Out: AI And Inclusion
  • Turner expands to Phase 1 on $5B One Beverly Hills project

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme