Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

Construction backlog stagnates, squeezing smaller contractors

Posted on August 13, 2024




Dive Transient:

  • Development backlog stagnated at 8.4 months in July as smaller contractors felt the brunt of the ache and builders’ revenue confidence hit almost a two-year low, in response to a Tuesday launch from Related Builders and Contractors.
  • Companies with annual income underneath $50 million pushed the backlog degree decrease over the previous month, in response to an ABC member survey. Solely the most important contractors, these with over $100 million in annual revenues, have an extended backlog than this time final 12 months, in response to the report. That combo cratered contractors’ outlooks for creating wealth going ahead. 
  • “Contractor confidence relating to revenue margins now stands on the lowest degree since November 2022, which comes as little shock,” stated Anirban Basu, ABC chief economist. “There at the moment are robust indications that elevated rates of interest have lastly taken their toll on quite a lot of privately financed building segments in addition to the broader financial system.”

Dive Perception:

Though bigger contractors have managed to safe an extended backlog and handle by means of financial headwinds, smaller corporations are more and more feeling the pinch, stated Basu.

ABC’s Development Confidence Index readings for gross sales, revenue margins and staffing ranges all decreased in July, however stay optimistic, albeit barely, in response to the report. 

With a rating above 50 indicating builders anticipate development, July’s revenue margin rating of fifty.6 means the outlook is simply marginally above water and is down from 55 a 12 months in the past. This decline in confidence displays the rising concern over profitability as contractors grapple with rising prices and unsure financial situations.

Lingering excessive building materials costs, that are nonetheless almost 40% above pre-pandemic ranges regardless of easing inflation, proceed to pull on trade exercise, in response to ABC. For that cause, Basu stated the Federal Reserve’s extremely anticipated rate of interest minimize is now assured, and will assist spur renewed building spending.

“With building spending down for the previous two months, the trade eagerly awaits decrease rates of interest,” stated Basu within the launch. “Given latest financial turmoil, the Federal Reserve will start chopping charges at its September assembly.”



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Snowball-Proofing Your Next Project
  • Command Alkon Acquires Digital Fleet to Expand Fleet Management Capabilities
  • Plant Production ‘One Of The Most Underrated Horticultural Sectors’, Says Young Industry Leader
  • Cost Of An Education App In 2025: Everything You Need To Know
  • Why Good Programming Projects Go Bad

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme