Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu

Chinese group to invest $1bn in Cambodian pumped storage

Posted on February 25, 2025




Prime Minister Hun Manet talking on the inauguration of the Tatai hydropower undertaking in 2024 (Sinomach)

A Chinese language industrial conglomerate is to take a position $1bn in a pumped-storage system in southwest Cambodia.

In line with information website Yicai, the Higher Tatai Pumped Storage Energy will likely be added to the 150MW Tatai hydropower scheme, which China Nationwide Equipment Business Company (Sinomach) hopes to finish subsequent 12 months.

The storage undertaking will use extra electrical energy from the hydropower undertaking to pump water between two reservoirs positioned 3km upstream from the dam. It will then be used to function 4 250MW generators, giving a most producing capability of 1GW.

The electrical energy will likely be used to clean inputs to the Cambodian grid, notably from intermittent mills similar to wind and photo voltaic.

China Heavy Equipment, a Sinomach subsidiary, will take the lead in constructing and working the station.

The state-owned agency, which is predicated in Sichuan province, has signed a construct, function and switch settlement with Cambodia’s Ministry of Mines and Vitality, in addition to state-run utility Electricité du Cambodge.

Beneath the settlement, Sinomach won’t pay lease on the land it makes use of, and could have fastened charges over the 40 years of its concession.

China Heavy Equipment will make investments $251m of its personal funds within the undertaking, with the rest coming from financial institution loans. The speed of return on funding is projected to above 8%.

Completion of the undertaking is anticipated earlier than 2030. 

  • Subscribe right here to get tales about development all over the world in your inbox 3 times per week



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Eating more fiber could help reduce the amount of forever chemicals in your blood, study finds
  • 5 Transformative L&D Tech Trends To Write About This Month
  • Clarios plans $1B plant to shore up US critical mineral supply
  • Useful Metrics for Evaluating Employee Performance in 2025
  • Hawaii’s $2.4bn telescope scheme axed for lack of funds

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme