Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

Balfour Beatty starts $140M California airport walkway

Posted on August 15, 2024




This audio is auto-generated. Please tell us when you have suggestions.

The U.S. arm of London-based Balfour Beatty has begun development work on Sacramento Worldwide Airport’s pedestrian walkway in California, in accordance with an Aug. 7 information launch from the contractor. The value of the mission is $140 million, per the Sacramento County Division of Airports.

The builder, as development supervisor in danger, will ship an roughly quarter-mile walkway that accommodates 1,800 tons of metal, 4 shifting walkways, 4 escalators and three elevators alongside a panoramic hall, in accordance with the announcement. 

As soon as full, the construction will join Terminal B to Concourse B by way of a skybridge, and provides passengers the power to stroll or trip the airport’s current automated individuals mover.

The $140 million bridge is a component of a bigger, $1.3 billion collection of enhancements to the Sacramento airport, often known as SMForward, per the county airport authority. It’s funded by $33 million in grant funds by the $1.2 trillion bipartisan infrastructure regulation, in addition to a low-interest federal mortgage by the Transportation Infrastructure Finance and Innovation Act and airport income bonds.

“The Sacramento Worldwide Airport is our native airport, so we take nice pleasure in bringing this mission in for a pleasant clean touchdown and turning it over to the neighborhood,” stated Kyle Frandsen, Balfour Beatty vp in Sacramento, within the contractor’s information launch.

Balfour Beatty executed preconstruction companies previous to formally beginning development, and the mission will likely be full in 2025, per the discharge.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Client Challenge
  • SMC and Alyve team up on end-to-end AI transformations
  • Lexicon Inc. Recognized For Setting High Standards For Employee Mental Wellness
  • The Future of Agile: PMI’s Role in Evolution and Best Practices
  • How to avoid falling behind on massive projects

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme