Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

California Contractor Achieves MBCEA’s AC478 for Safety, Quality

Posted on May 9, 2025




group of construction workers walking with their backs turned at dusk

The Metallic Constructing Contractors and Erectors Affiliation (MBCEA) introduced Facility Builders and Erectors Inc., based mostly in Anaheim, Calif., obtained AC478 accreditation for metallic constructing assemblers inspection. AC478 is run by the Worldwide Accreditation Service (IAS).

Reaching AC478 accreditation demonstrates Facility Builders and Erectors has personnel, organizational expertise, expertise, information, administration procedures, and dedication to assemble metallic buildings by code, specs, prices, and deadlines. Necessities for the accreditation embody documented administration techniques, security coaching, prime quality managers, OSHA coaching, security plans, and site-specific plans.

Robert Tiffin, president at MBCEA, says, “This quote, ‘We ship high quality with out having to be advised. We take it personally,’ on [Facility Builders and Erectors’] web site, roars of their unwavering tradition of high quality and security. It’s this all-in that guided and delivered them to full accreditation. Thanks and congratulations [Facility Builders and Erectors]!”

Ken Thomson, president at Facility Builders and Erectors, says he acknowledged AC478 accreditation as a possibility to strengthen core practices on the firm. “Our ardour for security and high quality, together with our appreciation for our workforce and our dedication to creating them the most effective within the trade, guides our strategy to each mission,” he says.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Snowball-Proofing Your Next Project
  • Adaptive Architecture for a Climate-Resilient Future
  • Client Challenge
  • Why Good Programming Projects Go Bad
  • Why Every Software Product Is A Ticking Time Bomb

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme