Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

2 international JVs competed for $4.6B Georgia road project

Posted on August 21, 2024




This audio is auto-generated. Please tell us you probably have suggestions.

Award: Toll lanes
Worth: $4.6 billion
Location: Forsyth and Fulton counties in Georgia
Purchasers: Georgia DOT

A $4.6 billion Georgia toll highway is transferring forward after the State Transportation Board authorised SR 400 Peach Companions on Aug. 15 for the public-private partnership mission. The consortium of road-building and engineering corporations will design, construct, partly finance, function and preserve the State Route 400 Specific Lanes for 50 years, with oversight by the Georgia DOT and the State Street and Tollway Authority.

SR 400 Peach Companions, the obvious greatest worth proposer, consists of Coral Gables, Florida-based ACS Infrastructure; Paris-headquartered funding supervisor Meridiam; Parsons of Chantilly, Virginia; and Dragados, Acciona Concesiones and Acciona Building, that are all headquartered in Madrid.

They beat out one different workforce, Georgia Specific Hyperlink Companions, made up of Roslyn Heights, New York-based Tikehau Star Infra; Amsterdam-based Arcadis; and Ferrovial Building and its subsidiary Cintra, each of Madrid.

The mission will add new specific lanes in each instructions alongside an roughly 16-mile part of Georgia 400 from the North Springs MARTA Station in Fulton County to about one mile north of McFarland Parkway in Forsyth County, per the mission web site. The lanes may have tolls that fluctuate primarily based on stage of visitors to permit drivers to bypass congestion, and a MARTA bus speedy transit line can also be slated to run alongside the hall toll-free. 

It’s half of a bigger building effort aiming to alleviate congestion on the SR 400 and I-285 interchange, and can instantly join with the proposed I-285 High Finish East. The brand new lanes will probably be a part of the Georgia Specific Lanes Community.

A mixture of personal sector, state, federal and native {dollars} will fund the mission, in accordance with mission paperwork. The non-public accomplice has dedicated to creating a concession fee to the state of $4.05 billion and can ship the mission by a mixture of financing strategies.

Building is predicted to start out in late 2025, per a mission truth sheet, and the lanes are slated to start out working by 2031.

Over the subsequent 12 months previous to building begin, the workforce will concentrate on finishing closing idea designs, environmental re-evaluations, acquiring needed mission financing and allowing, in accordance with the mission web site.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Granite-led JV taps into $240M Nevada water job
  • Collaboration in Construction: How Integrated Teams Drive Project Efficiency
  • AI Agent Architecture: Powering Next-Gen Learning Platforms
  • Skanska lands $250m Boston airport parking garage contract 
  • Micron (MU) Q3 2025 earnings report

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme