Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

Grimshaw team to design Athens airport expansion

Posted on March 28, 2025




Photographs courtesy of Grimshaw/the Anemos consortium

The Anemos consortium, fashioned of the UK’s Arup, Grimshaw and Haptic Architects, Athens’ Ok-Studio and Denmark’s Triagonal was chosen to design the enlargement of Athens Worldwide Airport (AIA), set to extend passenger capability from 26 to 40 million by 2032.

The airport will hold working throughout extensions and alterations to the primary and satellite tv for pc terminal buildings, plus gate and business areas.

The primary terminal redesign will run on a north to south axis with a modular stone façade that creates a ‘lifted’ inner colonnade. Six areas will likely be launched, directing passengers to the brand new check-in and departures corridor.

Mediterranean backyard within the sky

It would have an Athens-inspired landscaped Mediterranean backyard set in a 24.5m-high round, tiered area. One other terrace will likely be situated within the constructing’s south, with three terraced ranges organized round an atrium.

The satellite tv for pc terminal will likely be linked to the primary terminal by a tunnel and can home passport management and an atrium.

The Anemos consortium may even work on plane stands, plus landside and airside updates.

The masterplan goals to combine further daylight into inner areas. The undertaking is focusing on a LEED Gold certification.

AIA was accomplished in 2001 by Hochtief for the 2004 Summer time Olympics. It’s Greece’s largest airport and 20km from Athens’ centre.

Earlier this month, a staff comprising Aecom, Hill Worldwide and Salfo & Associates as companions was chosen to undertaking handle the AIA extension.

  • Subscribe right here to get tales about development around the globe in your inbox thrice per week



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • Simulation Training For Closing The Skills Gap Faster
  • Optimizing Healthcare Facilities with Aluminum Window Systems
  • General Mills forecasts weak annual profit as economic uncertainty weighs
  • Why Every Software Product Is A Ticking Time Bomb
  • Construction spending drops for fourth straight month

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme