Skip to content
PMMilestone :: Project Management and Engineering Blog
Menu
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
Menu
construction

JV completes $865M Florida bridge expansion project

Posted on March 27, 2025




This audio is auto-generated. Please tell us if in case you have suggestions.

On March 25, a brand new span of Florida’s Howard Frankland Bridge, which crosses Previous Tampa Bay and connects Tampa and St. Petersburg, opened to the general public, in response to native media reviews. The $865.3 million crossing is the most costly in Florida’s historical past, in response to Axios.

The design-build endeavor was led by a design-build three way partnership of Atlanta-based Archer Western and Evansville, Indiana-based Traylor Bros., in response to the venture web page. 

The finished bridge serves as the brand new southbound leg of I-275 for 4 general-use lanes. It additionally carries 4 categorical lanes, two in every course, that are slated to open subsequent yr, in response to the Tampa Bay Occasions.

The unique southbound span, adjoining to the brand new construction, will now carry northbound site visitors.  Earlier than the venture is full in spring 2026, the previous northbound bridge, initially opened in 1960, might be eliminated, per the venture’s info web page.

The transit artery is likely one of the most used thruways within the area, as a mean of 250,000 vehicles crossed the bridge every single day, in response to Axios. 

Along with the bridge, a bicycle and pedestrian pathway, separated from the roadway, continues to be underneath development, in response to the venture web page, and is slated to open in 2026.



Source link

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Facebook
  • Facebook
  • X
  • LinkedIn
  • PMMilestone Home
  • Blog
  • Project Management
  • Business
  • Engineering
  • 12000+ PM and Business Templates
  • Contact
  • Terms of Service
  • Privacy Policy
  • 6 Tools For Making Frustrating Tasks Fun Again
  • Faster Proposals and Smarter Builds
  • 3 Sure-Fire Ways To Screw Up Your Project
  • We are evolving from being a marketplace to a full-stack enabler for Indian MSMEs: Amazon India’s Gaurav Bhatnagar
  • Accessibility & Inclusion Online Conference

This page has been viewed 0 times.

©2025 PMMilestone :: Project Management and Engineering Blog | Design: Newspaperly WordPress Theme